Boberry

Slewing Bearing Rings

  • Dimension design: Outer/inner diameter, section height, and thickness manufactured strictly according to customer drawings.
  • Gear teeth: External or internal gear, module and tooth profile customized per design.
  • Bolt pattern: Bolt hole number, diameter, and PCD adjusted to match mating structures.
  • Surface protection: Anti-rust oil, coating, and packing method tailored for transport and storage conditions.

Technical Specifications

Item Specification
Product Name Slewing Bearing Rings
Synonyms Slewing bearing / slewing ring bearing / turntable bearing / rotary table bearing / rotary support
Material Standard bearing steel
Process Route Forging → Rough machining → Heat treatment → Final machining → Inspection
Machining CNC machining, lathing/turning, milling, boring, drilling, etc.
Heat Treatment Options Annealing, normalizing, quenching & tempering, and Hardening
Load Types Supported Axial load; Radial load; Tilting moment
NDT / NDE Options Magnetic particle test, Penetration test, Ultrasonic test, Radiographic test
Dimensions As customer required (per drawing)
Delivery Time 30–45 days
Supply Capacity 500–1000 tons/month
Packaging Seaworthy plywood cases or pallet (or as requested)
Main Markets Europe; US; North America; Asia

Applications

  • Marine equipment
  • Weapons and defense systems
  • Petrochemical industry installations
  • Mining machinery and handling systems
  • Nuclear power equipment
  • Thermal power plants
  • Hydropower stations

Manufacturing Capabilities

4000Ton Forging Hydraulic Press
Hydraulic Open Die Forging Hammer
Continuous Casting and Rolling Mill
Vertical Mill-Turn Machine

Forging Facilities

Heating Treatment Facilities

Machining Facilities

Testing & Quality Control

Production Process

Raw Material Inspection
Raw Material Inspection
Forging
Forging
Heat Treatment
Heat Treatment
Rough Machining
Rough Machining
Final Inspection
Final Inspection
Packaging
Packaging

Additional Value-added Services

Annealing Furnace
Annealing Furnace
Heat Treatment Cooling Pool
Heat Treatment Cooling Pool

Quality Assurance

X-ray Flaw Detector
X-ray Flaw Detector
ZEISSCMM Zeiss Three-coordinate
ZEISSCMM Zeiss Three-coordinate

Why Choose Boberry

Integrated Production

Integrated Production

Complete forging-to-machining production line ensures precision and fast delivery.

Advanced Equipment

Advanced Equipment

Heavy-duty forging presses and CNC systems handle large, complex mechanical component geometries.

Certified Assurance

Certified Assurance

Certified production with ISO9001, PED, SGS compliance and global OEM support.

Logistics & Delivery

Lead Time: 15–30 days (urgent) / 30–45 days (normal).
Monthly Capacity: 500–1000 tons.
Packing: Wooden crates, steel frames, or per client request.
Shipment: By Sea (recommended, saves cost for forging parts) / By Air (fast but expensive).
Payment Terms: 30% deposit with balance via B/L copy; or 100% L/C at sight.
Delivery Terms: FOB, CIF, CNF.

Let's Talk