Boberry

Metal Forged Step Shafts

  • Product Range: Step shafts, main shafts, and crank shafts.
  • Forging Capacity: 6300T, 3150T, and 2000T hydraulic presses; 1T–5T hammers.
  • Machining Capacity: Up to 70 tons, 32-ton CNC machine loading.
  • Dimensional Accuracy: Tolerance ±0.01 mm; surface roughness Ra 0.4.
  • Testing Coverage: 100% ultrasonic inspection with hardness and tensile testing.

Technical Specifications

Parameter Specification
Material High-quality ingot steel (per order specification)
Forging Type Open Die / Free Forging / Die Forging
Tolerance ±0.01 mm
Surface Roughness Ra 0.4
Heat Treatment Quench & Temper / Normalize / Anneal
Testing 100% UT + Mechanical Properties Test
Capacity 500–1000 Tons / Month
Delivery Time 15–30 Days (Urgent) / 30–45 Days (Normal)
Packaging Anti-rust oil + Wooden crate / Steel frame
Transport Options By Sea / Air / Train (FOB, CIF, DDP)

Customization & OEM Service

  • Custom step shaft dimensions, materials, and grades.
  • Design assistance and CAD drawing review.
  • Machining, threading, and surface finishing per customer drawings.
  • MOQ: 1 piece (sample service available).
  • OEM/ODM branding and international delivery (FOB, CIF, DDP).

Industries Served

  • Heavy machinery and metalworking equipment
  • Power generation systems
  • Pulp and paper processing
  • Marine propulsion systems
  • Food and industrial processing machinery

Manufacturing Capabilities

4000Ton Forging Hydraulic Press
Hydraulic Open Die Forging Hammer
Continuous Casting and Rolling Mill
Vertical Mill-Turn Machine

Forging Facilities

Heating Treatment Facilities

Machining Facilities

Testing & Quality Control

Production Process

Raw Material Inspection
Raw Material Inspection
Forging
Forging
Heat Treatment
Heat Treatment
Rough Machining
Rough Machining
Final Inspection
Final Inspection
Packaging
Packaging

Additional Value-added Services

Annealing Furnace
Annealing Furnace
Heat Treatment Cooling Pool
Heat Treatment Cooling Pool

Quality Assurance

X-ray Flaw Detector
X-ray Flaw Detector
ZEISSCMM Zeiss Three-coordinate
ZEISSCMM Zeiss Three-coordinate

Why Choose Boberry

Integrated Production

Integrated Production

Complete forging-to-machining production line ensures precision and fast delivery.

Advanced Equipment

Advanced Equipment

Heavy-duty forging presses and CNC systems handle large, complex mechanical component geometries.

Certified Assurance

Certified Assurance

Certified production with ISO9001, PED, SGS compliance and global OEM support.

Logistics & Delivery

Lead Time: 15–30 days (urgent) / 30–45 days (normal).
Monthly Capacity: 500–1000 tons.
Packing: Wooden crates, steel frames, or per client request.
Shipment: By Sea (recommended, saves cost for forging parts) / By Air (fast but expensive).
Payment Terms: 30% deposit with balance via B/L copy; or 100% L/C at sight.
Delivery Terms: FOB, CIF, CNF.

Let's Talk