Forged Steel Shafts
- Available Materials: Carbon steel, alloy steel, and stainless steel.
- Forging Process: Open die, free forging, or die forging, depending on specification.
- Precision Level: ±0.01 mm tolerance; surface finish Ra 0.4 achievable.
- Certifications: ISO 9001, PED, and SGS certified production system.
- Supply Capacity & MOQ: 500–1000 tons/month with 1-piece sample available.
Technical Specifications
| Parameter | Specification |
| Product Name | Forged Steel Shaft |
| Material | Carbon/Alloy/Stainless Steel |
| Forging Process | Open Die / Free Forging / Die Forging |
| Heat Treatment | Quench & Temper / Normalize / Anneal |
| Tolerance | ±0.01 mm |
| Surface Finish | Ra 0.4 |
| Certification | ISO9001 / PED / SGS |
| Supply Capacity | 500–1000 Tons / Month |
| Delivery Time | 15–30 Days (Urgent) / 30–45 Days (Normal) |
| MOQ | 1 Piece |
| Delivery Terms | FOB / CIF / DDP |
| Transport | Sea / Air / Train |
Customization & OEM Service
- Manufacture per customer drawings and tolerances.
- Support multiple materials and surface finishes.
- Provide full test documentation: hardness, UT/MT, dimensional, and mechanical reports.
- Offer OEM marking, customized packaging, and global shipping (FOB/CIF/DDP).
- Accept small orders (MOQ: 1 piece) and sample production runs.
Industries Served
- Machinery and heavy equipment
- Metalworking and rolling mills
- Pulp & paper processing
- Food processing and packaging machinery
- Power generation (turbine and generator shafts)
Manufacturing Capabilities
Forging Facilities
- 6300T / 3150T / 2000T free hydraulic presses.
- 5T, 3T, 2T, 1T, 750kg, 560kg electro-hydraulic hammers.
Heating Treatment Facilities
- RTX-9 series trolley furnaces in multiple sizes (5.5–8 m chamber length).
- RJ-9-850KW vertical furnace with 15 m depth.
- RTX-12-350KW high-temperature trolley furnace.
Machining Facilities
- CNC machines (max 32-ton load).
- Heavy-duty lathes and vertical mills (up to 70 tons).
- Gantry milling machines, deep-hole boring machines, grinding and turning centers.
Testing & Quality Control
- Spectrum analysis for chemical composition.
- Ultrasonic, non-destructive, and metallographic testing.
- Mechanical property test machines for yield, tensile, hardness.
Production Process
- Raw Material Selection: Use first-grade ingot steel, inspect chemical composition.
- Forging: Heat to precise temperature, perform open die or die forging.
- Heat Treatment: Quenching, tempering, or normalizing to meet mechanical targets.
- Machining: CNC turning, boring, milling, grinding, and drilling to precision ±0.01 mm.
- Inspection: Each shaft tested via 100% ultrasonic, hardness, and tensile checks.
- Packaging & Delivery: Anti-corrosion coating, safe transport packaging, global logistics support.
Additional Value-added Services
- Quench-and-temper heat treating
- Rough and finish turning
- Ultrasonic and mechanical testing
- Dimensional inspection reports
- Customized design and programming support
Quality Assurance
- Each forging carries a test bar for mechanical testing.
- 100% ultrasonic and visual inspection before shipment.
- Hardness, tensile, and metallographic verification.
- Compliance with ASTM, DIN, GB, and EN standards.
Why Choose Boberry

Integrated Production
Complete forging-to-machining production line ensures precision and fast delivery.

Advanced Equipment
Heavy-duty forging presses and CNC systems handle large, complex mechanical component geometries.

Certified Assurance
Certified production with ISO9001, PED, SGS compliance and global OEM support.
Logistics & Delivery
Lead Time: 15–30 days (urgent) / 30–45 days (normal).
Monthly Capacity: 500–1000 tons.
Packing: Wooden crates, steel frames, or per client request.
Shipment: By Sea (recommended, saves cost for forging parts) / By Air (fast but expensive).
Payment Terms: 30% deposit with balance via B/L copy; or 100% L/C at sight.
Delivery Terms: FOB, CIF, CNF.
Monthly Capacity: 500–1000 tons.
Packing: Wooden crates, steel frames, or per client request.
Shipment: By Sea (recommended, saves cost for forging parts) / By Air (fast but expensive).
Payment Terms: 30% deposit with balance via B/L copy; or 100% L/C at sight.
Delivery Terms: FOB, CIF, CNF.
